Precast elements

alt

Production

01

More than 1000 m³ of prestressing capacity manufactured monthly.

02

90 m³/h concrete plant.

03

Capacity for steam concrete curing, which includes a 500 HP boiler.

04

Metal structure manufacturing area with high manufacturing capacity.

05

Specialized transport of precast elements, lifting and assembly of high specifications.

06

Prestressing plant with production capacity 24/7.

Do you want to know more about our projects?

Download and discover more